As of 2/16/15, all of the greenside bunkers on the back 9 at Cowan Creek are in some stage of renovation. Holes #17, 18, and the chipping green have the new liners and sand installed on them. Holes #10 and #16 are currently shelled out, and are in the process of finishing liner installation. Every bunker will have a small portion of exposed liner around the perimeter until all bunkers have been renovated and have new sand. At this point, the contractors will then line the bunker edges with new sod.